ServicesOur WorkAreasContactGet a Free Quote(224) 421-2832

Antioch, IL · Lake Catherine, IL · Channel Lake, IL

Basement Finishing

Turning an unfinished basement into real living space: a bedroom, a second living room, or both.

With winters that regularly drop well below freezing, a finished basement is one of the most cost-effective ways to add livable square footage in this region without touching the roofline. The work is more than drywall: insulation sized for the climate, moisture management before anything gets framed, and an egress window if the plan calls for a legal bedroom.

We coordinate around whatever sump or drainage system is already in the house rather than assuming it can be ignored. A finished basement is only worth building if it stays dry.

What that covers

  • Framing & insulation
  • Egress windows for legal bedrooms
  • Drywall & finish carpentry
  • Flooring rated for below-grade moisture
  • Bathrooms & wet bars
  • Coordination around sump & drainage systems

Need a price?

Tell us what you are thinking and we will come look at it. Scope and cost in writing before anything starts.

Call (224) 421-2832Get a Free Quote