ServicesOur WorkAreasContactGet a Free Quote(224) 421-2832

Antioch, IL · Lake Catherine, IL · Channel Lake, IL

Concrete & Hardscape

Driveways, walkways and patios in poured concrete or pavers, built for a frost-heave climate.

Frost heave is the reason so many driveways and walkways in this region crack and lift within a few winters of being poured. The base prep matters more than the finish: proper depth, drainage, and expansion joints placed where the slab actually needs to move, not just where they look even.

We do both poured concrete and paver work, and a fair amount of our concrete calls are repairs and replacements of slabs that heaved because the original base wasn't built for the climate.

What that covers

  • Driveways & aprons
  • Walkways & steps
  • Patios
  • Poured concrete & pavers
  • Frost-resistant base prep
  • Repair & replacement of heaved slabs

Need a price?

Tell us what you are thinking and we will come look at it. Scope and cost in writing before anything starts.

Call (224) 421-2832Get a Free Quote