ServicesOur WorkAreasContactGet a Free Quote(224) 421-2832

Antioch, IL · Lake Catherine, IL · Channel Lake, IL

Roofing

Roof replacement and repair built around ice dams, hail, and a real Midwest freeze-thaw cycle.

Ice damming is the single most common roof failure we see in this region: heat escaping an attic melts snow on the upper roof, it refreezes at the eave, and water backs up under the shingles. Proper ice-and-water shield at the eaves and correct attic ventilation prevent it, and both matter more here than the shingle brand does.

Spring and summer hail is the other recurring cause of roof work in Lake County and southeastern Wisconsin, and we handle storm-damage assessment and repair alongside full replacements.

What that covers

  • Asphalt shingle replacement
  • Ice & water shield at eaves
  • Ventilation & attic insulation tie-in
  • Storm & hail damage repair
  • Flashing & valleys
  • Gutter coordination

Need a price?

Tell us what you are thinking and we will come look at it. Scope and cost in writing before anything starts.

Call (224) 421-2832Get a Free Quote