ServicesOur WorkAreasContactGet a Free Quote(224) 421-2832

Antioch, IL · Lake Catherine, IL · Channel Lake, IL

Kitchen Remodeling

Full kitchen remodels across the Chain O'Lakes region, from a single-wall refresh to a complete reconfiguration.

Most of the kitchens we're called into were built in the 1960s through the 1980s: galley layouts, low sightlines to the next room, and electrical that was never sized for a modern range or a double oven. A remodel here usually starts with the footprint, not the finishes: opening a wall, moving a run of cabinets, or resetting where the sink and range actually sit.

Material choices get made with real Illinois and Wisconsin winters in mind. Countertops and cabinetry near windows take temperature swings for months at a time, and flooring around a kitchen sink deals with humidity that spikes every time a lake-country basement gets damp. We spec for that rather than for a showroom.

What that covers

  • Cabinetry & custom storage
  • Countertops (quartz, granite, butcher block)
  • Backsplash & tile work
  • Layout reconfiguration & wall removal
  • Lighting & electrical updates
  • Flooring integrated with the rest of the main level

Need a price?

Tell us what you are thinking and we will come look at it. Scope and cost in writing before anything starts.

Call (224) 421-2832Get a Free Quote